Application brief
Review roof-level routing, equipment zones and access positions together. The selected duct construction and terminal arrangement follow the hall ventilation design and the confirmed installation drawings.
Selection checkpoints
Material matched to the duty
Choose materials and finishes for the air conditions and environment. Grade and thickness follow the agreed project schedule.
Connections that fit the site
Check connection details, available installation space and access requirements before confirming the supply list.
Drawing-based selection
Share drawings, dimensions and quantities to align construction, interfaces and the required accessories.
Case images and layouts are illustrative references; final details follow approved project drawings.
Back to cases →