Application brief
External air intake and extract openings require coordination between the louvre, wall opening and duct connection. Review weather exposure, drainage, mesh and maintenance access with the project requirements. Face and opening dimensions should be identified clearly in the drawing.
Selection checkpoints
Material matched to the duty
Choose materials and finishes for the air conditions and environment. Grade and thickness follow the agreed project schedule.
Connections that fit the site
Check connection details, available installation space and access requirements before confirming the supply list.
Drawing-based selection
Share drawings, dimensions and quantities to align construction, interfaces and the required accessories.
Case images and layouts are illustrative references; final details follow approved project drawings.
Back to cases →